Western Tunnel Excavations

Excavations of Al - Aqsa Mosque

Western Tunnel Excavations

These excavations began in 1970 and stopped after four years, then resumed until the end of 1988, it reached a length of 450 meters, it extended under the traces and historic Islamic buildings.

More articles

All
  • Excavations of Al - Aqsa Mosque

    Excavations of Umayyad Palaces

    There is an area called the “Umayyad palaces”. These excavations extend from it to “Silwan…

  • Excavations of Al - Aqsa Mosque

    Excavations in Al-Aqsa Mosque

    Jerusalem has been home to a lot of successive civilizations over successive decades. It…

  • Excavations of Al - Aqsa Mosque

    Silwan and “Wadi Hilwa” Excavations

    These excavations are located approximately 100 m from the southern fence of Al- Aqsa.…

  • Excavations of Al - Aqsa Mosque

    The First Excavations after the Israeli Occupation

    The occupation resumed the excavations in Jerusalem in 1967, and it was under the Old Town…